Lakeview Park Play Equipment Replacement

The City of Burien plans to replace the playground equipment and associated park furnishings at Lakeview Park this year. Our goal is to replace the equipment within the same footprint and have play features for the 5- to 12-year-old youth age group. The equipment for the 2- to 5-year-old age group was installed in 2019 and is not due for replacement.

Ver en español (YouTube)

Get Involved

Take a Survey!

The community is invited to watch a video and take a survey to provide feedback on the theme of the primary play feature and secondary play toy options.

Project Contact

ParksProjects@burienwa.gov

 (206) 988-3700

Background Information

This project will replace the existing playground equipment at Lakeview Park (422 SW 160th St in Burien) and park furnishings that are 20 years old and have reached the end of service life.  The new equipment will fit within the existing footprint and have age-appropriate features for the 5- to 12-year-old youth age group. The equipment for the 2- to 5-year-old age group was installed in 2019 and is not due for replacement.

From the community feedback, City staff will work with a playground equipment manufacturer on the final design for the primary play feature and incorporate secondary play toys as space and budget allow.

This project is funded by the City of Burien and King County Community Development Block Grant funding provided through the U.S. Department of Housing and Urban Development.   

Existing Equipment

Existing play equipment at Burien's Lakeview Park for 5- to 12-year-olds features a blue, green, and gray play structure with slides, monkey bars, and other activities. Some benches appear in the foreground.
Existing play equipment for 5- to 12-year-olds at Lakeview Park.

New Equipment Options

Secondary Toy Options

Option A: Swings

Option B: Bucket Spinner

Option C: Standing Spinner

Option D: Net Spinner

Option E: Climber

Option F: Spring Board

Project Timeline

May 2024

Gather community feedback

June 2024

Evaluate community feedback and finalize design

Fall/Winter 2024

Construction

Late 2024/Early 2025

Playground re-opens for use